Should be a pretty big day and a half coming up. The goal is to get front brakes on, mount the transmission to finally get it off the dolly, install the shifter or at least start it and figure out how I'm routing my transmission cooler lines. Might try and get the pedal and throttle cable setup if I can get a hand at some point. Leaving Sunday morning to spend some time with my parents so the timeline is going to be tight but at least I'll be able to get the old man to fire up the welder and get my firewall steering column mount setup.
Need to get it rolling ASAP so I can move it to the new garage. Also picked up a Miguiar's DA drill attachment along with their compound, polish and wax packs along with a pressure washer and foam cannon. Would really like to get the Challenger show ready and in the garage as well but that's a battle for a different day. At the very least the remainder of the plastidip should be gone by the end of the weekend hopefully.
Need to get it rolling ASAP so I can move it to the new garage. Also picked up a Miguiar's DA drill attachment along with their compound, polish and wax packs along with a pressure washer and foam cannon. Would really like to get the Challenger show ready and in the garage as well but that's a battle for a different day. At the very least the remainder of the plastidip should be gone by the end of the weekend hopefully.